AAPTP
  • Small
  • Medium
  • Large
  • Small
  • Medium
  • Large
  • Home
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • Checklists
  • Abbreviations
  • About
  • HOME
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • CHECKLISTS
  • ABBREVIATIONS
  • About
1. Introduction (0)
2. Project Organization (3)
3. Asphalt Materials and Mix Design (2)
4. Mix Production (2)
5. Surface Preparation (3)
6. Mixture Delivery (4)
7. Mix Placement (3)
8. Compaction (4)
9. Joint Construction (3)
10. Segregation (2)
11. Quality Assurance (8)
12. Mat Problems (3)
13. Appendix (0)
1. Introduction (1)
2. Project Organization (2)
3. Asphalt Materials and Mix Design (17)
4. Mix Production (35)
5. Surface Preparation (17)
6. Mixture Delivery (6)
7. Mix Placement (30)
8. Compaction (13)
9. Joint Construction (27)
10. Segregation (11)
11. Quality Assurance (4)
12. Mat Problems (12)
13. Appendix (0)
1. Introduction (0)
2. Project Organization (0)
3. Asphalt Materials and Mix Design (3)
4. Mix Production (1)
5. Surface Preparation (4)
6. Mixture Delivery (0)
7. Mix Placement (0)
8. Compaction (1)
9. Joint Construction (0)
10. Segregation (0)
11. Quality Assurance (3)
12. Mat Problems (1)
13. Appendix (0)
Back

All Tables

Table 13. Mat Problems and Their Causes
Table 13. Mat Problems and Their Causes

Find problem above: ✓ indicates causes related to the paver and X indicates other problems to be investigated
NOTE: Many times a problem can be caused by more than one item; therefore, it is important that each cause listed be eliminated to ensure that the problem will be solved.

Previous Table

© National Asphalt Pavement Association (NAPA). All rights reserved|Privacy Policy

6406 Ivy Lane, Suite 350 Greenbelt, Maryland 20770-1441

|888-468-6499
  • LinkedIn
  • Facebook
  • Twitter
  • YouTube
  • Instagram
Information

There are no items associated with the selected chapter.