Plant Checklists Checklist for batch plant Project Information Airport Name Facility Date Created Checklist Do the scales comply with specifications? Have the scales been calibrated? Have the scales been checked for tolerance? Does the binder bucket tare properly? Does the weigh box hang free? Are the mixer parts in good condition and adjustment? Is the proper size batch being mixed? Are the bin draws in proper sequence? Is binder distributed uniformly along the length and width of the pugmill? Are the aggregates and binder at proper temperatures? Do any valves or gates leak? Is the mixing time adequate? Are the weight points set properly for batch weights? Are the mixer shafts revolving at proper speed? Are the screen capacities sufficient to handle the feed from the dryer? Are the screens clean? Are the screens worn or broken? Is the screen carryover irregular or excessive? Are the hot-bin partitions solid without signs of excessive wear? Are the overflow chutes free-flowing? Is the amount of needed material in each bin being maintained? Is the access for sampling adequate? Contact Information Name Phone Email