All Videos

Communication on Airfield Projects

Communication on Airfield Projects

Reporting, Ticketing, and Tracking

Reporting, Ticketing, and Tracking

Materials in a Job Mix Formula

Materials in a Job Mix Formula

Balanced Mix Design for Airfield Mixtures

Balanced Mix Design for Airfield Mixtures

Production at a Drum Mix Plant

Production at a Drum Mix Plant

Safety on Asphalt Projects

Safety on Asphalt Projects

Prime and Tack Coat

Prime and Tack Coat

Milling and Cleaning

Milling and Cleaning

Smoothness Requirements on Airfields

Smoothness Requirements on Airfields

Yield Calculations

Yield Calculations

Loadout from Plant to Truck

Loadout from Plant to Truck

Paver Operations

Paver Operations

Screed Controls

Screed Controls

Types of Rollers

Types of Rollers

Factors Affecting Compaction

Factors Affecting Compaction

Minimum Thickness

Minimum Thickness

Transverse Joint Construction

Transverse Joint Construction

Longitudinal Joint Construction

Longitudinal Joint Construction

Echelon Paving

Echelon Paving

Segregation at the Asphalt Plant

Segregation at the Asphalt Plant

Segregation at the Job Site

Segregation at the Job Site

Common QA Lab Tests

Common QA Lab Tests

Percent Within Limits

Percent Within Limits

Complete Lot Report

Complete Lot Report

Sampling Procedures

Sampling Procedures

Coring

Coring

Control Strips for FAA Jobs

Control Strips for FAA Jobs

Smoothness Interpretation

Smoothness Interpretation

Roller Operations

Roller Operations

Loadout from the Truck to the MTV and Paver

Loadout from the Truck to the MTV and Paver