AAPTP
  • Small
  • Medium
  • Large
  • Small
  • Medium
  • Large
  • Home
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • Checklists
  • Abbreviations
  • About
  • HOME
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • CHECKLISTS
  • ABBREVIATIONS
  • About
1. Introduction
  • 1.1 Handbook Purpose and Organization
  • 1.2 Airfield Paving
  • 1.3 Asphalt Mixtures Defined and Classified
  • 1.4 Workmanship
  • 1.5 Certification and Accreditation Programs
2. Project Organization
  • 2.1 Introduction
  • 2.2 Project Documents
  • 2.3 Preconstruction Conference
  • 2.4 Ongoing Communication
  • 2.5 Ongoing Records
  • 2.6 Safety
3. Asphalt Materials and Mix Design
  • 3.1 Introduction
  • 3.2 Asphalt Binder: Grading Systems And Properties
  • 3.3 Aggregate Characteristics And Properties
  • 3.4 Mixture Volumetrics
  • 3.5 Asphalt Mix Properties
  • 3.6 Additives
  • 3.7 Mix Design Procedures
  • 3.8 Laboratory Versus Plan-produced Mixes
  • 3.9 Summary
4. Mix Production
  • 4.1 Introduction
  • 4.2 Material Storage and Handling
  • 4.3 Aggregate Cold Feed
  • 4.4 Aggregate Drying and Heating
  • 4.5 Batch Plants
  • 4.6 Drum and Continuous Plants
  • 4.7 Emission-Control System
  • 4.8 Temporary Mixture Storage
  • 4.9 Weighing and Loadout
  • 4.10 Safety
  • 4.11 Troubleshooting and Checklists
5. Surface Preparation
  • 5.1 Introduction
  • 5.2 Base Preparation for New Asphalt Pavements
  • 5.3 Asphalt Surface Preparation for Asphalt Overlays
  • 5.4 PCC Surface Preparation For Asphalt Overlays
  • 5.5 Tack Coat
  • 5.6 Summary
6. Mixture Delivery
  • 6.1 Introduction
  • 6.2 Planning
  • 6.3 Truck Types
  • 6.4 Proper Truck Loading
  • 6.5 Hauling Procedures
  • 6.6 Unloading the Mix
  • 6.7 Tracking Quantities
7. Mix Placement
  • 7.1 Introduction
  • 7.2 Tractor Unit
  • 7.3 Screed Unit
  • 7.4 Grade Control
  • 7.5 Layer Thickness
  • 7.6 Establishing Paver Speed
  • 7.7 Related Paving Operations
  • 7.8 Best Practices Checklists
8. Compaction
  • 8.1 Introduction
  • 8.2 Definitions
  • 8.3 Rollers
  • 8.4 Factors Affecting Compaction
  • 8.5 Compaction Variables Under The Operator’s Control
  • 8.6 Determination of Rolling Pattern
  • 8.7 Roller Checklists
9. Joint Construction
  • 9.1 Introduction
  • 9.2 Transverse/Construction Joints
  • 9.3 Longitudinal Joints
  • 9.4 Echelon Paving and Rolling
  • 9.5 Unconventional Longitudinal Joint Methods
10. Segregation
  • 10.1 Introduction
  • 10.2 Recognizing Physical Segregation, Causes, and Solutions
  • 10.3 Four Stages Where Segregation Can Originate
  • 10.4 Thermal Segregation
  • 10.5 Confirming and Quantifying Segregation
11. Quality Assurance
  • 11.1 Introduction
  • 11.2 Definitions
  • 11.3 General Types Of Specifications
  • 11.4 Quality Control Plan
  • 11.5 Sampling Methods
  • 11.6 Quality Control At The Plant
  • 11.7 Quality Control In The Field: Placement And Compaction
  • 11.8 Acceptance
12. Mat Problems
  • 12. Mat Problems
  • 12.1 Surface Waves
  • 12.2 Tearing (Streaks)
  • 12.3 Nonuniform Texture
  • 12.4 Screed Marks
  • 12.5 Screed Responsiveness
  • 12.6 Surface (Auger) Shadows
  • 12.7 Poor Precompaction
  • 12.8 Joint Problems
  • 12.9 Checking
  • 12.10 Shoving And Rutting
  • 12.11 Bleeding And Fat Spots
  • 12.12 Roller Marks
  • 12.13 Poor Mix Compaction
  • 12.14 Other Pavement Problems
Appendix
  • AAPTP Airport Asphalt Videos

5. Surface Preparation

5.2 Base Preparation for New Asphalt Pavements

5.2.1 Subgrade Soil

If the asphalt pavement is to be placed directly on the subgrade soil, that subgrade material should meet all applicable requirements for moisture content, density, structural support, grade, elevation, and smoothness. After the subgrade soil is determined to be ready for paving, and before paving is allowed to commence, the subgrade should be proof rolled to ensure it will be able to support the weight of the haul traffic. Proof rolling is a process where compacted soil is checked for soft areas in order to supply a balanced support system for the structure of the pavement. The subgrade must provide a firm foundation before the application of the prime coat or the asphalt paving begins. If distortion of the subgrade soil occurs during the paving operation, placement of the mix should be stopped until the condition of the soil can be corrected.

5.2.2 Granular Base Course

If the asphalt layer is to be constructed directly on a new or existing untreated granular base layer, that base material should be placed to grade and profile and meet all the requirements for moisture content, density, structural strength, and smoothness. Proof rolling should be done, however, on top of the granular base material, and the amount of deflection of the base and the amount of indentation of the truck wheels in the granular base course material should be noted. If the base material is stable and dry and does not deflect and indent significantly under the wheels of a loaded tandem axle truck, placement of the prime coat or the new asphalt mix should be permitted to start. If the condition of the granular material is not satisfactory, the base course should be reworked or stabilized until it is in the proper condition for overlaying. Check with the owner agency for any specific requirements they may have for proof rolling.

5.2.3 Prime Coat

Watch Video

Prime and Tack Coat

The prime coat acts as a temporary waterproofing layer that protects the subgrade soil as well as the base course. A prime coat helps maintain the prepared moisture content of the subgrade and base materials by preventing moisture from escaping while also helping to prevent these layers from absorbing excess moisture during rainfall before paving. Prime coats allow these layers to be used for light traffic on roadways, bind together any dust on the surface of these material layers, promote the bond, and prevent slippage between these layers and the new asphalt overlay. However, the main purpose of a prime coat is to protect the underlying materials from wet weather. If the underlying materials can be covered prior to the rainfall, then a prime coat may not be needed.

There is generally no need to place a prime coat of asphalt emulsion or cutback asphalt on the subgrade soil. This is especially true when the soil is a silty clay or clay material because the prime coat material cannot be absorbed into that subgrade material. The use of a prime coat on sandy subgrade soils is also questionable. If the sandy material displaces excessively under the wheels of the haul trucks, it should be stabilized with some type of binder material before paving to achieve the required load-bearing properties. In such cases, the application of a prime coat will generally not be enough to hold the sandy soil in place during paving operations. A prime coat should not be used as a substitute for proper preparation of the subgrade soil. When a prime coat is used, the prime coat material should be applied to the base course with a pressure distributor at least 48 hours before paving is to begin.

Historically, cutbacks have been the preferred prime coat material because of their superior penetrative qualities into the base. However, increased environmental restrictions on the use of cutback materials have led to their decreased availability and use. Industry has responded with the development of EAPs (emulsified asphalt primes) that improve an emulsion’s ability to mimic cutbacks in terms of penetration and are more environmentally friendly than cutbacks.

An EAP penetrates more slowly and is applied at a lower rate. Unlike a cutback prime, EAPs are most successful when mixed into the base material by a motor grader or rotary-mixer type equipment. This mixing can be done at the time of final grading and rolling of the base material. Prime applications are done under the same general weather conditions as paving; however, for cutbacks to properly cure, 24 to 72 hours of favorable weather are required. Curing times depend greatly on the material and weather conditions.

The ideal prime rate is the amount of material that the aggregate base will absorb in a 24-hour period. Typical application rates for prime coats vary with the type of prime coat material used. When a medium-curing cutback—either an MC-30 or MC-70 as specified in AASHTO M 82—is used, the application rate ranges from 0.2 to 0.5 gal/yd2 (0.9 to 2.3 L/m2). When an EAP is used, application rates vary from 0.1 to 0.3 gal/yd2/inch of scarification depth (0.5 to 1.4 L/m2 per 25 mm of depth). Exact application rates are determined by the project engineer under the prevailing conditions at the time the work is done. If all the prime coat material is not completely absorbed, the excess should be blotted with sand or removed.

Previous Section
Next Section

© National Asphalt Pavement Association (NAPA). All rights reserved|Privacy Policy

6406 Ivy Lane, Suite 350 Greenbelt, Maryland 20770-1441

|888-468-6499
Information

There are no items associated with the selected chapter.