AAPTP
  • Small
  • Medium
  • Large
  • Small
  • Medium
  • Large
  • Home
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • Checklists
  • Abbreviations
  • About
  • HOME
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • CHECKLISTS
  • ABBREVIATIONS
  • About
1. Introduction
  • 1.1 Handbook Purpose and Organization
  • 1.2 Airfield Paving
  • 1.3 Asphalt Mixtures Defined and Classified
  • 1.4 Workmanship
  • 1.5 Certification and Accreditation Programs
2. Project Organization
  • 2.1 Introduction
  • 2.2 Project Documents
  • 2.3 Preconstruction Conference
  • 2.4 Ongoing Communication
  • 2.5 Ongoing Records
  • 2.6 Safety
3. Asphalt Materials and Mix Design
  • 3.1 Introduction
  • 3.2 Asphalt Binder: Grading Systems And Properties
  • 3.3 Aggregate Characteristics And Properties
  • 3.4 Mixture Volumetrics
  • 3.5 Asphalt Mix Properties
  • 3.6 Additives
  • 3.7 Mix Design Procedures
  • 3.8 Laboratory Versus Plan-produced Mixes
  • 3.9 Summary
4. Mix Production
  • 4.1 Introduction
  • 4.2 Material Storage and Handling
  • 4.3 Aggregate Cold Feed
  • 4.4 Aggregate Drying and Heating
  • 4.5 Batch Plants
  • 4.6 Drum and Continuous Plants
  • 4.7 Emission-Control System
  • 4.8 Temporary Mixture Storage
  • 4.9 Weighing and Loadout
  • 4.10 Safety
  • 4.11 Troubleshooting and Checklists
5. Surface Preparation
  • 5.1 Introduction
  • 5.2 Base Preparation for New Asphalt Pavements
  • 5.3 Asphalt Surface Preparation for Asphalt Overlays
  • 5.4 PCC Surface Preparation For Asphalt Overlays
  • 5.5 Tack Coat
  • 5.6 Summary
6. Mixture Delivery
  • 6.1 Introduction
  • 6.2 Planning
  • 6.3 Truck Types
  • 6.4 Proper Truck Loading
  • 6.5 Hauling Procedures
  • 6.6 Unloading the Mix
  • 6.7 Tracking Quantities
7. Mix Placement
  • 7.1 Introduction
  • 7.2 Tractor Unit
  • 7.3 Screed Unit
  • 7.4 Grade Control
  • 7.5 Layer Thickness
  • 7.6 Establishing Paver Speed
  • 7.7 Related Paving Operations
  • 7.8 Best Practices Checklists
8. Compaction
  • 8.1 Introduction
  • 8.2 Definitions
  • 8.3 Rollers
  • 8.4 Factors Affecting Compaction
  • 8.5 Compaction Variables Under The Operator’s Control
  • 8.6 Determination of Rolling Pattern
  • 8.7 Roller Checklists
9. Joint Construction
  • 9.1 Introduction
  • 9.2 Transverse/Construction Joints
  • 9.3 Longitudinal Joints
  • 9.4 Echelon Paving and Rolling
  • 9.5 Unconventional Longitudinal Joint Methods
10. Segregation
  • 10.1 Introduction
  • 10.2 Recognizing Physical Segregation, Causes, and Solutions
  • 10.3 Four Stages Where Segregation Can Originate
  • 10.4 Thermal Segregation
  • 10.5 Confirming and Quantifying Segregation
11. Quality Assurance
  • 11.1 Introduction
  • 11.2 Definitions
  • 11.3 General Types Of Specifications
  • 11.4 Quality Control Plan
  • 11.5 Sampling Methods
  • 11.6 Quality Control At The Plant
  • 11.7 Quality Control In The Field: Placement And Compaction
  • 11.8 Acceptance
12. Mat Problems
  • 12. Mat Problems
  • 12.1 Surface Waves
  • 12.2 Tearing (Streaks)
  • 12.3 Nonuniform Texture
  • 12.4 Screed Marks
  • 12.5 Screed Responsiveness
  • 12.6 Surface (Auger) Shadows
  • 12.7 Poor Precompaction
  • 12.8 Joint Problems
  • 12.9 Checking
  • 12.10 Shoving And Rutting
  • 12.11 Bleeding And Fat Spots
  • 12.12 Roller Marks
  • 12.13 Poor Mix Compaction
  • 12.14 Other Pavement Problems
Appendix
  • AAPTP Airport Asphalt Videos

4. Mix Production

4.11 Troubleshooting and Checklists

A daily summary report of all plant activities should be kept. This should include the results of all tests performed during the day and a tabulation of the amounts of material received and used during production.

The following checklists can be used as needed by plant operation and QC personnel to determine plant readiness for production:

PLANT CHECKLISTS

Checklist for material handling and storage

❑       Do the aggregates meet specifications?

❑       Are the proper sizes being produced?

❑       Is the aggregate storage satisfactory?

❑       Are the stockpiles separated properly?

❑       Are the stockpiles constructed properly?

❑       Is the stockpiled aggregate handled correctly?

❑       Is segregation being controlled?

❑       Is the mineral filler or hydrated lime being kept dry?

Checklist for cold feed

❑       Does the cold-feed setup comply with specifications?

❑       Do the cold-feed bins contain properly sized aggregates?

❑       Are the cold-feed bins charged properly?

❑       Are the cold-feed bins flowing (without bridging) properly?

❑       Do the cold aggregate feeders perform satisfactorily?

❑       Are the cold aggregate feeder gates set correctly?

❑       Are all cold aggregates being fed uniformly?

❑       Are the cold aggregate feeders calibrated?

Checklist for asphalt heating, circulating, and temperature of mixture

❑       Is the asphalt uniformly heated to the temperature specified?

❑       Have all the lines been checked for leaks?

❑       Are mix production temperatures within specifications?

❑       Has the binder feed been calibrated?

Checklist for drum-mix plant

❑       Have the aggregate feeds been calibrated?

❑       Has the liquid binder feed been calibrated?

❑       Are the aggregate and binder feeds interlocked?

❑       Are the plant components in good condition and adjusted?

❑       Is the binder at the proper temperature when introduced into the drum?

❑       Does the mix appear to be uniformly coated?

❑       Is water dripping from the bottom of the storage silo?

❑       Do the scales comply with specifications?

❑       Have the scales been calibrated?

❑       Have the scales been checked for tolerance?

Checklist for batch plant

❑       Do the scales comply with specifications?

❑       Have the scales been calibrated?

❑       Have the scales been checked for tolerance?

❑       Does the binder bucket tare properly?

❑       Does the weigh box hang free?

❑       Are the mixer parts in good condition and adjustment?

❑       Is the proper size batch being mixed?

❑       Are the bin draws in proper sequence?

❑       Is binder distributed uniformly along the length and width of the pugmill?

❑       Are the aggregates and binder at proper temperatures?

❑       Do any valves or gates leak?

❑       Is the mixing time adequate?

❑       Are the weight points set properly for batch weights?

❑       Are the mixer shafts revolving at proper speed?

❑       Are the screen capacities sufficient to handle the feed from the dryer?

❑       Are the screens clean?

❑       Are the screens worn or broken?

❑       Is the screen carryover irregular or excessive?

❑       Are the hot-bin partitions solid without signs of excessive wear?

❑       Are the overflow chutes free-flowing?

❑       Is the amount of needed material in each bin being maintained?

❑       Is the access for sampling adequate?

Checklist for dryer and dust collector

❑       Does the dryer and dust collector comply with specifications?

❑       Is the aggregate properly dried?

❑       Are the aggregates at the proper temperature?

❑       Are the dryer components in balance?

❑       Is the dryer production in balance with other plant components?

❑       Are temperature-measuring devices installed correctly and calibrated?

❑       Are the collected fines wasted, or are they fed back to the mixing chamber?

❑       Is the dust-return system in balance with the dryer?

Checklist for storage silos

❑       Does the silo contain a batcher?

❑       Are the baffles or other devices to prevent segregation working properly?

❑       Is the silo discharge opening properly configured to prevent segregation?

❑       Does the discharge gate open and close efficiently?

Checklist for sampling and testing

❑       Are sufficient samples being taken to comply with the sampling plan?

❑       Are the samples representative of the material?

❑       Are all the tests being conducted properly?

❑       Are the test results available soon enough to be effective?

❑       Are the records complete and up-to-date?

Checklist for miscellaneous responsibilities

❑       Have the truck beds been inspected?

❑       Are the truck beds drained after release agent application?

❑       Is the release agent on the agency’s Approved Product List (APL)?

❑       Do the trucks meet specification requirements?

❑       Are the trucks equipped with tarpaulins or covers?

❑       Does the mix have a uniform appearance?

❑       Does the mix satisfy the placing requirements?

❑       Have all personnel been properly instructed?

❑       Are safety measures being observed?

Previous Section
Next Section

© National Asphalt Pavement Association (NAPA). All rights reserved|Privacy Policy

6406 Ivy Lane, Suite 350 Greenbelt, Maryland 20770-1441

|888-468-6499
  • LinkedIn
  • Facebook
  • Twitter
  • YouTube
  • Instagram
Information

There are no items associated with the selected chapter.