AAPTP
  • Small
  • Medium
  • Large
  • Small
  • Medium
  • Large
  • Home
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • Checklists
  • Abbreviations
  • About
  • HOME
  • Handbook
    • Asphalt Paving Handbook
    • Videos
    • Figures
    • Tables
  • CHECKLISTS
  • ABBREVIATIONS
  • About
1. Introduction
  • 1.1 Handbook Purpose and Organization
  • 1.2 Airfield Paving
  • 1.3 Asphalt Mixtures Defined and Classified
  • 1.4 Workmanship
  • 1.5 Certification and Accreditation Programs
2. Project Organization
  • 2.1 Introduction
  • 2.2 Project Documents
  • 2.3 Preconstruction Conference
  • 2.4 Ongoing Communication
  • 2.5 Ongoing Records
  • 2.6 Safety
3. Asphalt Materials and Mix Design
  • 3.1 Introduction
  • 3.2 Asphalt Binder: Grading Systems And Properties
  • 3.3 Aggregate Characteristics And Properties
  • 3.4 Mixture Volumetrics
  • 3.5 Asphalt Mix Properties
  • 3.6 Additives
  • 3.7 Mix Design Procedures
  • 3.8 Laboratory Versus Plan-produced Mixes
  • 3.9 Summary
4. Mix Production
  • 4.1 Introduction
  • 4.2 Material Storage and Handling
  • 4.3 Aggregate Cold Feed
  • 4.4 Aggregate Drying and Heating
  • 4.5 Batch Plants
  • 4.6 Drum and Continuous Plants
  • 4.7 Emission-Control System
  • 4.8 Temporary Mixture Storage
  • 4.9 Weighing and Loadout
  • 4.10 Safety
  • 4.11 Troubleshooting and Checklists
5. Surface Preparation
  • 5.1 Introduction
  • 5.2 Base Preparation for New Asphalt Pavements
  • 5.3 Asphalt Surface Preparation for Asphalt Overlays
  • 5.4 PCC Surface Preparation For Asphalt Overlays
  • 5.5 Tack Coat
  • 5.6 Summary
6. Mixture Delivery
  • 6.1 Introduction
  • 6.2 Planning
  • 6.3 Truck Types
  • 6.4 Proper Truck Loading
  • 6.5 Hauling Procedures
  • 6.6 Unloading the Mix
  • 6.7 Tracking Quantities
7. Mix Placement
  • 7.1 Introduction
  • 7.2 Tractor Unit
  • 7.3 Screed Unit
  • 7.4 Grade Control
  • 7.5 Layer Thickness
  • 7.6 Establishing Paver Speed
  • 7.7 Related Paving Operations
  • 7.8 Best Practices Checklists
8. Compaction
  • 8.1 Introduction
  • 8.2 Definitions
  • 8.3 Rollers
  • 8.4 Factors Affecting Compaction
  • 8.5 Compaction Variables Under The Operator’s Control
  • 8.6 Determination of Rolling Pattern
  • 8.7 Roller Checklists
9. Joint Construction
  • 9.1 Introduction
  • 9.2 Transverse/Construction Joints
  • 9.3 Longitudinal Joints
  • 9.4 Echelon Paving and Rolling
  • 9.5 Unconventional Longitudinal Joint Methods
10. Segregation
  • 10.1 Introduction
  • 10.2 Recognizing Physical Segregation, Causes, and Solutions
  • 10.3 Four Stages Where Segregation Can Originate
  • 10.4 Thermal Segregation
  • 10.5 Confirming and Quantifying Segregation
11. Quality Assurance
  • 11.1 Introduction
  • 11.2 Definitions
  • 11.3 General Types Of Specifications
  • 11.4 Quality Control Plan
  • 11.5 Sampling Methods
  • 11.6 Quality Control At The Plant
  • 11.7 Quality Control In The Field: Placement And Compaction
  • 11.8 Acceptance
12. Mat Problems
  • 12. Mat Problems
  • 12.1 Surface Waves
  • 12.2 Tearing (Streaks)
  • 12.3 Nonuniform Texture
  • 12.4 Screed Marks
  • 12.5 Screed Responsiveness
  • 12.6 Surface (Auger) Shadows
  • 12.7 Poor Precompaction
  • 12.8 Joint Problems
  • 12.9 Checking
  • 12.10 Shoving And Rutting
  • 12.11 Bleeding And Fat Spots
  • 12.12 Roller Marks
  • 12.13 Poor Mix Compaction
  • 12.14 Other Pavement Problems
Appendix
  • AAPTP Airport Asphalt Videos

5. Surface Preparation

Asphalt Surface Preparation for Asphalt Overlays

The degree of preparation needed for an existing asphalt pavement depends on the condition of that surface. At a minimum, failed areas should be removed and replaced, potholes properly patched, cracks cleaned out and sealed, and ruts filled in or, preferably, removed by cold milling.

5.3.1 Pavement Replacement and Patching

It is inadvisable to attempt to cover failed areas of an existing pavement with new overlay material. Removal and replacement should be carried out on all existing pavement areas where severe load-related distress has occurred. All asphalt mixtures and granular base materials that have failed should be excavated or cold milled and then either recycled or wasted. Subgrade distortion should be repaired by undercutting and replacement with suitable backfill material. Proper subsurface drainage should be installed as necessary. New granular base course material, a stabilized base course, or asphalt mix should be placed to bring the strength of the pavement structure in each failed area to the same level as the surrounding good pavement layers. If asphalt mix is used to patch a large area, it should be placed with a paver and compacted with one or more large rollers. Localized failed areas should be patched properly. Each area should be cut back to sound pavement and squared up, with the sides as vertical as possible, the loose material and water in the hole removed, a tack coat applied to the sides and bottom of the hole, the mix placed in the hole, and the new material adequately compacted, preferably with a roller (see Figure 56, Figure 57, and Figure 58). If the pothole is deeper than 4 inches (100 mm), the mix should be placed in more than one layer and each layer compacted properly. If the number of localized patches required is excessive, consideration should be given to full lane replacement, considering all economic and operational impacts.

It is inadvisable to attempt to cover failed areas of an existing pavement with new overlay material. Removal and replacement should be carried out on all existing pavement areas where severe load-related distress has occurred.

Figure 56. Existing Material Removed Prior to Patching

Source: Asphalt Institute
Figure 56. Existing Material Removed Prior to Patching

Figure 57. Material Placed in Localized Patch

Source: Asphalt Institute
Figure 57. Material Placed in Localized Patch

Figure 58. Compaction of Patch

Source: Asphalt Institute
Figure 58. Compaction of Patch

5.3.2 Crack Filling

Badly cracked pavement sections, especially those with pattern cracking (e.g., map or alligator), must be patched or replaced. The benefits of filling other cracks in the existing surface depend, in part, on the width of the cracks. If the cracks are narrow (less than 3/8 inches [10 mm] in width), it is doubtful that the crack-sealing material will enter the crack instead of pooling on the pavement surface. Such cracks should be widened, if desired, with a mechanical router before sealing is attempted. If wider cracks are present, they should be blown out with air and cleaned of debris. The crack-sealing material should be inserted when the cracks are clean and dry. The level of the filling material for the crack should be slightly lower than that of the surrounding pavement surface and should not spill over the top of the crack, where it could create a bump in the new pavement layer during the rolling process (see Figure 59). Previously overbanded cracks may require the aged sealant material to be heated and scrapped from the surface of the pavement prior to placing an overlay to prevent the same bump creation. If cracks are wider than 1 inch (25 mm), or if the pavement on either side of the crack is slumping, then a mastic sealing process is encouraged prior to overlay to promote a smoother finished surface.

Depending on the cause of the cracking, the amount of reflective cracking that occurs in an overlay can sometimes be reduced using a surface treatment (seal coat) on the existing pavement. If that pavement structure contains a great number of cracks, consideration may be given to applying a surface treatment instead of filling individual cracks. The cracks should be cleaned, if feasible, by being blown out with air. The surface treatment should be applied when the pavement surface is clean and dry and should consist of a single application of asphalt binder material (asphalt binder, cutback asphalt, or asphalt emulsion) and cover aggregate. While not too common, a slurry seal consisting of an asphalt emulsion, fine aggregate, and water may alternatively be used.

Figure 59. Bump Caused by Excessive Use of Crack Sealant

Source: U.S. Army Corps of Engineers
Figure 59. Bump Caused by Excessive Use of Crack Sealant

5.3.3 Leveling Courses

Common practice in the past has been to place a leveling course on the existing pavement surface to improve the rideability of the pavement structure. This leveling course, sometimes called a wedge and level course or a scratch course, is designed to fill in the low spots on the pavement surface. The leveling action is accomplished using the floating screed on the paver, with more asphalt mix being placed in the low spots than on the high spots in the existing pavement surface. The areas with thicker mix, however, typically compact more than areas with thinner mix. This problem, termed differential compaction, requires that multiple courses be constructed over a pavement surface that is badly out of shape before a smooth surface can be obtained.

As the mix passes from under the paver screed, it is in a relatively loose condition, being just slightly compacted by the vibratory screed. Compaction by the rollers reduces the thickness of the newly placed layer. The rule of thumb is that conventional mixes will compact approximately 1/4 inch per 1 inch (6 mm per 25 mm) of compacted thickness. Thus, to achieve a compacted course 1 inch (25 mm) thick, about 1-1/4 inches (31 mm) of mix would have to be placed by the paver. Similarly, approximately 3-3/4 inches (95 mm) of mix would need to pass from under the paver screed to construct a layer with a compacted thickness of 3 inches (75 mm). Also, better results for leveling courses have been noted when the gradation is on the fine side of the MDL. The asphalt mixture shall be placed at a compacted lift thickness no less than 3 times its NMAS for fine-graded mixes and no less than 4 times its NMAS for coarse-graded mixes. Moreover, a smaller NMAS gradation is advisable, as larger-sized gradations are more prone to their largest stones dragging and marring the surface created in high spots of the leveled surface.

When a leveling course is placed, the asphalt mixture laid in the low areas (in the wheelpaths if the pavement is rutted) will be thicker than the mix placed over the high points in the surface (between the wheelpaths). The thicker mix will compact more under the rollers, particularly if a pneumatic tire roller is used, than will the mix that is thinner. Thus, low spots will still exist in the wheelpaths where the mix has been compacted to a different degree (and thus a different air void content) than the mix between the wheelpaths. Because of the problem of differential compaction, multiple layers of mix are usually needed to eliminate the roughness in the existing pavement surface. A rule of thumb is that one layer after compaction will remove approximately 80 percent of a low spot. Two layers, each being compacted separately, will remove approximately 95 percent of a low spot

5.3.4 Milling

Watch Video

Milling and Cleaning

Milling, also called cold planing, is a process that removes a portion of the existing pavement layer to provide the desired surface elevation and texture for asphalt or concrete overlays. In general, the milling is categorized into full or partial depth depending on the amount of material removed, which is often dictated by the existing pavement condition. Full-depth milling refers to the removal of the entire asphalt layer down to the base and applies to the severely deteriorated pavement structure. Partial-depth milling removes only an upper portion of the asphalt layer that is distressed (rutted and/or cracked), and the remaining asphalt layer continues serving as a structural layer after rehabilitation. Determining the milling depth is a primary concern of partial-depth rehabilitation since the milling depth affects the quality, productivity, and project cost. The goal is to mill to a depth below the distresses so as not to inhibit the desired performance of the new asphalt layer.

Milling can be accomplished in any width necessary, from 6 inches (150 mm) to more than 13 ft (4 m). Figure 60 shows a typical milling machine. If equipped with automatic grade and slope controls like those used on an asphalt paver, the milling machine can produce a level surface in one pass over the existing surface. The RAP produced by the milling process can be hauled back to the asphalt plant for future recycling. In addition, if the milled surface is properly cleaned, its texture can enhance the bond between the new and old layers and may reduce the possibility of slippage of the overlay over the existing surface.

Figure 60. Typical Milling Machine

Source: Roadtec
Figure 60. Typical Milling Machine

When the milling depth is variable or slightly thinner than the existing asphalt lift thickness, a “scab” may form. A scab refers to a thin layer of an existing layer that was not completely removed in the milling process (see Figure 61). The scab often results in variations in surface texture and elevation. In addition, the bond between the scab and the remaining existing asphalt may also weaken during the milling and paving process. Scabbing is likely to contribute to lower ride quality and density issues due to differential compaction between the scabbed and non-scabbed areas. Scabbing is also likely to cause premature pavement distresses, including cracking and delamination, that eventually shorten pavement surface life. To prevent scabbing, the contractor should closely monitor milling depth, especially when milling over concrete pavement. If scabbing occurs during the milling operation, the contractor should lower the milling head to fully remove the scabbing or drop back and perform another pass to fully remove the scabbing. The contractor and owner should agree on any adjustments to the milling depth as this will likely result in more asphalt mix to be placed, resulting in a contract overrun. Slowing the forward speed of the milling machine may also help mitigate the occurrence of scabbing.

Figure 61. Scabbing

Source: Asphalt Institute
Figure 61. Scabbing

A pavement surface that has been milled is typically very dusty and dirty. Once the pavement has dried, multiple sweepings with a mechanical broom are usually needed to remove all the residual grit from the milled surface. In some cases, it may be necessary to dampen the milled surface before sweeping or to air-blow or flush the milled surface with water to remove dust and very fine material completely. While this cannot be done on airfields, opening the milled surface to traffic will help remove the dust and very fine material. Any dust and dirt left on the milled surface will greatly affect the bond between that course and the new asphalt overlay.

Any dust and dirt left on the milled surface will greatly affect the bond between that course and the new asphalt overlay.

Because of the increased surface area of the milled pavement (from the grooves left by the cutting teeth on the milling machine), an additional quantity of tack coat material may be required to ensure an adequate bond between the old and new layers (see Figure 62). That increased quantity is a function of the type, number, condition, and spacing of the teeth on the cutting mandrel of the milling machine but is typically in the range of 20 to 30 percent more than for an unmilled surface.

Figure 62. Tack Coat on a Milled Surface

Source: Asphalt Institute
Figure 62. Tack Coat on a Milled Surface

Previous Section
Next Section

© National Asphalt Pavement Association (NAPA). All rights reserved|Privacy Policy

6406 Ivy Lane, Suite 350 Greenbelt, Maryland 20770-1441

|888-468-6499
Information

There are no items associated with the selected chapter.